Electrical engineering activites on very high voltage networks

partager sur facebook partager sur twitter
20 February 2008
jpg - 48.8 kb
Equipment for unrolling cables for very high voltage lines (photo DR).

These works are specified by the French electricity company (EDF) and include:

Design:
EDF designs the very high voltage networks. The contrators are responsible for designing the foundation blocks for pylons and poles.

Construction:
This involves the constructing the foundations, assembling pylons, installing accessories and unrolling and adjusting cables.

Maintenance:
This involves replacing supports and accessories that have worn out or been damaged by storms and joining broken cables.

 